The Evergreen State College
Archives & Special Collections
Accession 76-14
Administration
Executive V.P.
Facilities
Architect
Series : Blueprints : Library Building 1968-1994
Location : FF1 Drawer 15
Location: FF2 Drawer 1
- 06/01/1971 Naramore Bain Brady & Johanson - Seattle: TESC Laboratory and Science Building - Phase 1
- 05/09/1988 Eskilsson, Architecture - Seattle: TESC Capital Remodelings Project
- CB87-600 Computer Classroom
- CB87-389 Library Proper 3rd Floor
- CB87-599 Science Stores, Lab I
- CC87-607 Isolated Chemical Storage Lab I
- 04/28/1998 S.M. Stemper Architects - Seattle: TESC Lecture Hall Improvements
Location FF2 Drawer 2
- 1970 Durham Anderson Freed Architects - Seattle: State Job 68-676 As Built Drawings TESC Library
- 07/24/1984 [? ]: Media Services Remodel -
Library Area B, First Floor
- Relocation of Washington State film Library
- Communications Program
- Photography & Media Production
- 04/20/1988 Hubenthal, Robert J. - [?]; Proposed Floor Plan "A: Media Services Remodel - Phase 1, Library Building - the Evergreen State College
- 12/29/1989 TESC Facilitites, Jon D. Collier, College Architect - Olympia: Media Loan/Circulation Remodel
- 03/1990 10 Year Growth Plan 1990
- 05/03/1990 Elaine Day Latourell & Associates Architects & Environmental Planners - Seattle: TESC Remodelling at Circulation /Media Loan
- 04/06/1992 TESC Office of Facilities - Olympia: Library Building First Floor Section 1B: Relocate Photo Darkroom Project
- 05/04/1992 93-103 Capital Budget Request Proposal - Olympia:
Language Lab/ Media Services, Library Building 1st Floor
- 05/12/1992 Durham Anderson Freed - Seattle: The Library Building - The Evergreen State College... 1st Floor Plan - Section B Photo Lab
- 06/12/1992 Tres West Engineers Inc. - Tacoma: Reolcated Photo Darkroom Project
- 07/23/1992 L.N. Storset & Associates, Consulting Engineers - Tacoma: First Floor Library Section B - Relocate Photo Darkroom
- 09/10/1992 TESC Facilities - Olympia: Relocate Photo Darkroom Revised Floor Plan
- 03/29/1996 Buffalo Design - Seattle/Tacoma: TESC Library Building Remodel:
- 656146 Media Services Remodel
- 656147 Academic Computing Expansion
- 656172 Archives Humidity Control
Series : Misc. Large Format Campus Planning Documents 1968-
- 1. Campus Master Plan blueprint
- 2. Library DTF report posters
- 3. others
Series : Construction Photographs 1969-
Location : Photograph Shelves, Workroom
Subseries : 8 X 10 Series
Box 1 of 16 Natural Settings, Pre-existing Structures and Temporary Buildings,
Aerial Campus Views
- Natural Settings prior to Site preparation
- Pre-existing and Temporary buildings
- Pre-Excavation Campus Grounds
- Carter Studio
- #01. Upside-down shell of old station-wagon in center of photograph.
Charred logs in foreground, with other assorted metal junk. Metal
pipes at right. [On back: Mall Area]
- #02. Old stove(?), metal headboard, bed springs and other metal
junk in center of photograph, surrounded by charred logs. [On back:
Mall Area]
- #03. Home-made wooden slide in center of photograph. Wooden fence
at left. [On back: Student Activities]
- #04. Trail through woods, begins in center foreground, curves
to the right. [On back: Soc. Sciences, Humanities]
- Buildings and Grounds-Aerial Views
- Construction
- #01. Construction/Looking North West. Bus loop in foreground. Library
nearing completion. Lecture Hall and CAB under construction. Underground
tunnels partially exposed at right. Shoreline is visible at very top
of photograph. Top right corner is blurry.
- #02. Construction/Looking North West. Evergreen Parkway in foreground.
Cluster of temporary buildings in center of photograph. Student Housing
at right, with crane. Library building and Central Utility Plant nearing
completion. Eld Inlet is visible along top of photograph. Top right
corner is blurry.
- #03. Construction/Looking North West. Eld Inlet cuts through the
center of the photograph (horizontally). Evergreen campus in front
of inlet, surrounded by expansive forest on all sides. Campus is still
under construction.
- #04. Construction/Looking South East. Library building, nearing
completion, in center of photograph. Forest in foreground, with road
at right and in lower-left corner. McCann plaza visible at upper right.
- #05. Construction/Looking South East. Parking Lot "F"
at right, with the rest of campus behind it. Large crane over residence
halls. Forest in the foreground. Hills visible in background (with
more forest).
- #06. Construction/Looking South East. Eld Inlet in foreground. Evergreen
campus is pretty far away-center of photograph. Hills in background.
Part of helicopter(?) diagonal across upper-right corner.
- Completion
- #07. Completion/Looking North West. Clocktower clock time is 11:10.
Bus loop in center foreground, partially obscured by trees. CAB
and bridge to CRC at far right. Eld Inlet is in the background.
- #08. Completion/Looking North West. Clocktower clock time is 12:20(?).
Evergreen Parkway is in foreground. Good view of the main parking
lots, which are mostly empty. Eld Inlet runs across the top of the
photograph with far shoreline.
- #09. Completion/Looking South West. Soccer field and tennis courts
in center foreground. Driftwood Road runs along right-hand edge.
Parking lots at left.
- #10. Completion/Looking East. Lower half of photograph is all
forest, with "SS" Road curving through at left. Clocktower
time is 5:30(?).
- #11. Completion/Looking West. Lower half of photograph is all
forest, with "C" Road running vertically and becoming
Driftwood at Overhulse intersection. "F" Lot and Cooper's
Glen Apartments at right. Lower right-hand corner is blurry. Part
of airplane wing(?) visible at left.
- #12. Completion/Looking South East. Lower 1/3 of photograph is
Eld Inlet. Evergreen Campus to the right of center-very distant.
It is hard to see much detail in the buildings.
- #13. Completion/Looking North East. This is the only color photograph
in this category. Clocktower clock time is 1:45.
- Architect's Rendering (Model)
- #14. Architect's Rendering/Preliminary model? This model is different
than all the other models and the completed campus construction.
- #15. Architect's Rendering/Lab Buildings in center foreground.
Baseball fields in upper-right corner. Model does not extend to
upper left corner.
- #16. Architect's Rendering/View from directly above model. Sun-like
plaza in very center of photograph. Baseball fields at right. There
are many differences between the buildings in this model and the
completed buildings.
- #17. Architect's Rendering/Wider view of campus. Foreground and
background of model is two-dimensional, with painted trees and forests.
Box 2 of 16 Campus Grounds - Site Preparation
- Access Road Construction - Unattributed Photographers
- Ron Allen Photography 1969-1973
- Access Roads 1969-1973
- Road "A" (Evergreen Parkway)
- #01. "A" Road E./69-120 Grading/2-27-70
- #02. "A" Road KISOR/69-120 Grading/2-27-70
- #03. "A" Road W./69-120 Grading/2-27-70
- #04. Road A E. of Meadow/69-120 Grading/7-2-70
- #05. Road A W. Crossing Overhulse from E. of Swamp/69-120 Grading/7-2-70
- #06. Road A E. from Overhulse/69-120 Grading/7-2-70
- #07. Road A. Overhulse from West/9-11-1970
- #08. Road A. Across Meadow/9-11-1970
- #09. E. Along 66 Culvert/8-24-71
- #10. #72-224 G. Road A. S. Ext. Looking East/10-9-72
- #11. #72-224 G. Road A. S. Ext. Looking West/10-9-72
- #12. #72-224 G. Road A. S. Ext. Looking East/11-22-72
- #13. #72-224 G. Road A. S. Ext. Looking West/11-22-72
- Road "B" (McCann Plaza)
- #14. Road B. S./69-120 Grading/9-19-69
- #15. Road B N. From Road A/69-120 Grading/7-2-70
- #16. Road B to N./9-11-1970
- Road "C" (Kaiser Road Extension?)
- #17. UP Road C from AN/9-11-1970
- Road "C.N." (Overhulse Place)
- #18. E. Along Road CN/7-22-71
- #19. Road CN Looking East/72-225/7-5-73
- #20. Road C.N. Looking West/72-225/7-5-73 [Earthmover in foreground]
- #21. Road C.N. Looking West/72-225/7-5-73 [Pile of dirt in distance]
- #22. Road C.N. Looking West/72-225/7-5-73 [Pile of dirt in foreground]
- #23. Road C.N. Looking East/72-225/7-30-73
- #24. Road C.N. Looking West/72-225/7-30-73 [Bottom left corner-stake
leaning, tied with ribbon]
- #25. Road C.N. Looking West/72-225/7-30-73 [Middle right side-box
(?) on side of road]
- Road "C.P." (Fireweed Drive)
- #26. Walkway at Head CP Road/6-22-71
- #27. CP Road/7-22-71
- Road "C.S." (?)
- #28. S. Along Road C.S./8-24-71
- Road "M.S.(Hidden Springs Drive)
- #29. M.S. Road/69-120 Grading/9-19-69
- #30. M.S. Road S./69-120 Grading/10-17-69
- #31. M.S. Road N./69-120 Grading/11-7-69
- #32. M.S. Road S./69-120 Grading/12-5-69
- #33. M.S. Road N./69-120 Grading/2-27-70
- Road "PN" (?)
- #34. P.N. Road Looking N./8-31-73
- #35. P.N. Road Looking S./8-31-73
- Road "S.S." (Geoduck Lane)
- #36. S.S. Road N./69-120 Grading/9-19-69
- #37. S.S. Road S./69-120 Grading/10-1-69
- #38. S.S. Road From Driftwood/69-120 Grading/7-2-70
- Road "S.D." (?)
- #39. S.D.-1 From Driftwood/9-11-1970
- #40. S.D. East of M. S. Road/6-22-71
- #41. West Ditch Rework/8-24-71
- Site Preparation : 1969-1971
- Administration Area
- #01. Adm. Area/69-120 Grading/12-5-69
- Athletics Area
- #02. Athletic/69-120 Grading/9-19-69
- #03. Athletic Area E./69-120 Grading/7-2-70
- #04. Athletic Area from Pile of dirt/9-11-1970
- #05. Athletic Area from S.W./7-22-71
- A.U.D. (?)
- #06. A.U.D. W/69-120 Grading/10-1-69
- Clearing
- #07. CLEARING/69-120 Grading/12-5-69
- Corporation Yard
- #08. Corporation Yard from S.W./6-22-71
- Parking Lots
- #09. S.E. Lot B from S.E./6-22-71
- #10. W. Side of Lot B from N.W./6-22-71
- #11. Overview of Lot B from N.W./8-24-71
- #12. N. 1/2 Lot C from E./6-22-71
- #13. Walkway N.W. Lot C/6-22-71
- #14. Parking Lot F/9-11-1970
- Miscellaneous
- #15. Mound from S.W./69-234 Site Improvements/8-27-71
- #16. Outfall N of Driftwood/7-22-71
- #17. Pete Bog/69-120 Grading/10-17-69
- Plaza Area
- #18. Plaza Area/69-120 Grading/7-2-70
- Pump House and Reservoir Sites
- #19. Pumphouse Site/9-11-1970
- #20. Resevoir Site/9-11-1970
- #21. Resevoirs from Pumphouse/7-22-71
- Residence Halls
- #22. Residence Hall Clearing/69-120 Grading/7-2-70
- Stockpile (temporary storage for excess topsoil)
- #23. STOCKPILE/69-120 Grading/9-19-69
- #24. Stock Pile N. of Driftwood/69-120 Grading/7-2-70
- Storm Sewer
- #25. Storm Sewer/69-120 Grading/10-1-69
- Utilities Tunnels (E and W) and Z-Crete Line
- #26. Tunnel E/69-120 Grading/10-17-69
- #27. Tunnel Row From W./69-120 Grading/7-2-70
- #28. E.W. Tunnel/9-11-1970
- #29. Tunnel E. from 11+10/6-22-71
- #30. Above Tunnel W from 3+40/7-22-71
- #31. Z-crete Line from N./6-22-71
- #32. Z-crete S. to MH2/7-22-71
- McConnell's Studio 1972
- Access Roads 1972
- Road "C"
- #01. Looking East on C Road From Crest of Hill or 1/3 of the
Road/9-28-72
- #02. Looking South East on C Road from Curve to Join Existing
Road/9-28-72
- #03. Looking West on C Road from Curve/9-28-72
- #04. Plumbing on the Beginning of C Road/9-28-72
- #05. Looking East from Crest of Hill, on C Road Extension/10-20-72
- #06. Looking East from Existing C Road to Extension/10-20-72
- #07. C Road Extension, Approximately 1/2 Way Looking South Easterly
Direction, Gravel Fill/10-20-72
- #08. Looking South East on C Road Extension Connecting Road
A/10-20-72
- #09. C Road Extension From Modular Housing Looking East/11-15-72
- #10. Culvert on C Road Extension At Side Road to Maintenance
Building/11-15-72
- Unattributed Photographers
- Access Road Construction
- #01. Pick-up truck carrying dirt, coming down road towards foreground.
Steamshovel behind truck. Row of large tubes on left bank of road.
- #02. Two machines digging large hole. Small John Deere bulldozer
in foreground, large steamshovel in background. Two men supervising
from left side of hole.
- #03. Close-up of front-end loader, facing towards viewer. Front
bucket is full of dirt and being raised.
- #04. Two earthmovers in motion, both facing left side of photograph.
- #05. Two earthmovers in motion. The left one is facing the left
side of the photograph, the right one is facing forwards.
- #06. Two earthmovers in motion. The left one is more in the background,
facing forwards. The right one is facing the right side of the photograph.
- #07. Two earthmovers driving down Evergreen Parkway, facing towards
the left side of the photograph.The earthmover in the foreground
(JD 860, #2) is about forty feet ahead of the second earthmover.
- #08. Truck with trailer holding large wire spool. Wires run through
center of photograph. Two-layered stack of tubes in foreground.
Steamshovel, two dumptrucks and P.I.E. truck in background.
Box 3 of 16 Library Building Construction 1969-70
- Ron Allen Photography
- Site Preparation
- Construction 1971-72 (Completed building)
- Interiors 1972
- Cowley Photos 1969-1971 (see press releases 86-03
for Construction Progress Reports)
- Skyview Photos 1970-1971
Box 4 of 16 Library Building Construction and Completion 1969-1975
- Unattributed Photographers 1969-1972
- Renderings and Plans
- #01. Photograph of artist's rendering of completed library building/Learning
Resources Center-The Evergreen State College-Olympia Washington/Durham
Anderson Freed AIA Architects/January 1969
- #02. Basement Floor Plan
- #03. First Floor Plan
- #04. First Floor Plan Area "B"
- #05. Enlargement of portion of First Floor Plan Area "B"
- #06. Second Floor Plan
- #07. Third Floor Plan
- #08. Fourth Floor Plan
- Library Construction
- Pre-Construction
- #01. Pre-construction/Foundation excavation (color)
- First Floor Construction
- #02. First floor/Rebar infrastructure columns, crane on left side
of photograph, several construction workers in background. Two long
wood boxes lean against rebar in foreground, at right. Shirt draped
over pipes in foreground, at left.
- #03. First floor/Two large stacks of 2"X4"s in left
foreground. Also in foreground, rear view of construction worker
carrying two boards on his shoulder. Column infrastructures with
scaffolding in background.
- #04. First floor/View through rebar grid. Columns at far left
and right are cement. Columns in background are steel and rebar,
two with scaffolding.
- #05. First floor/View from corner of the building. Man adjusting
pipes in lower left-hand corner. Most columns are cement. Many piles
of debris on building floor.
- #06. First floor/Clocktower foundation in foreground, library
first floor in background with cement columns.The first few walls
have been constructed. Cement mixer and crane in front of the library,
towards left side of photograph.
- #07. First floor/Wide shot of construction from slight elevation.
Cement mixer and crane at far left.
- #08. First floor/Entry to basement. Southwest corner near loading
dock. Truck coming out of basement. Crane at left.
- Second Floor Construction
- #09. Second floor/Beginning stages of second floor construction.
Some rebar column infrastructure in place, no exterior walls. Dump
truck in center of photograph unloading dirt. [On back: Front Plaza
(East looking West)(Clocktower off right)].
- #10. Second floor/Many concrete exterior walls. P&H crane
in center of photograph. Two men on roof, one holding long stick.
- #11. Second floor/Front face. Work beginning on third floor. Pile
of dirt in foreground, covered with snow. Several men on roof standing
around large cube of building materials(?).
- #12. Second floor/Corner view. Two large pipes in foreground.
Snow on the ground. Large crane (Pettibone 30 Multikrane) in center
of photograph.
- Third Floor Construction
- #13. Third floor/Loading dock side. Scaffolding across second
and third floors, wood stacked against building on first floor.
Something large, covered with plastic sheeting, to the right of
the wood.
- #14. Third floor/Loading dock side. Scaffolding across second
and third floors. Lecture Hall in background, under construction.
Three cars and half a truck at left.
- #15. Thrid floor/Crane ("Galion") at right lifting stack
of boards to roof. Pick-up truck in front of crane. "Hoffman
Construction"(?) truck in background, at right.
- #16. Third floor/Front face. Scaffolding over second and third
floors, also on roof. Two men on the roof. The ground is extremely
muddy, with large puddles and much construction debris.
- #17. Third floor/Many tubes stacked in foreground at left. Two
large wooden pallets at right. At left edge, half a tire is visible.
- #18. Third floor/From corner of building. Clocktower in background
is half-completed. Large crane to its right. Four large tubes in
foreground.
- #19. Third floor/From bridge to Clocktower. Lecture Hall at left
in background, under construction. Many vehicles between Library
and Lecture Hall. Two scaffolds up against Library.
- #20. Third floor/East face. Stacks of wood on third floor balcony.
In foreground, grading and preparation to pour concrete for walkways.
- #21. Third floor/Corner view. Scaffolding along left side of building.
Boxes stacked on third floor balcony. Pick-up truck (washed out)
in center foreground. Behind it, "Galion" crane.
- #22. Third floor/Dr. David Barry, Vice President and Provost in
foreground at right, with right arm extended. Library and Clocktower
behind him, both under construction.
- Clocktower Construction
- #23. Clocktower/Slightly taller than third floor. "Pettibone"
crane in center of photograph. Three workmen on left side of Clocktower.
- #24. Clocktower/Slightly taller than fourth floor. Tree in foreground
at left. Very large crane in front of Clocktower.
- #25. Clocktower/Close-up of Clocktower and walkway construction.
Temporary wooden guardrails on walkways. Four workmen- two facing
camera, carrying boards, two with backs to camera.
- #26. Clocktower/One floor from completion. Scaffolding over top
two floors. Fire hydrant in foreground, center. Six workmen to the
left of the Clocktower.
- Interior Construction
- #27. Interiors/Second floor Library lobby. Stairs are completed,
no handrails yet. Floor and walls are unfinished. Box with slatted
wooden sides in foreground at left.
- #28. Interiors/Library roof from below-grid with skylights. Scaffolding
at right. Workman at left, with second workman one floor above.
- Landscaping
- #01. Front face/View from CAB(?). Clock time is 9:18. Two cement
mixers with striped revolving drums at right.
- #02. Front face/View from bus loop. Clock time is 9:16. Two students
in foreground at right. Some water on ground. Grass has not yet been
planted.
- #03. Front face/View from NE of bus loop. Clock time is 9:26. Three
vehicles parked at right. At left, big tree and base of small hill.
- #04. Front face/View from steps to Lecture Hall. Clock time is 9:04.
No people, no grass. Motorcycle parked next to building, at left.
US mailbox in front of main entrance, at right.
- #05. Front face/View from edge of Red Square near Clocktower. No
grass, trees or benches yet. Two permanent garbage cans. One man with
briefcase in center of photograph.
- #06. Back face/View from west looking east. Large rocks in foreground
at left. John Deere bulldozer in foreground at right. Pathway is not
yet paved. Date on back is 3-25-74.
- #07. Back face/View from east looking west. Pipe sticking out of
ground in center of photograph. Three workmen walking along the side
of the building. Pathway is not yet paved. Date on back is 3-25-74.
- #08. Back face/View from west looking east. Rocks at left with trees
behind them. Pathway paved halfway, with wooden barrier in front of
it.
- #09. Back face/View from east looking west. Pipe sticking out in
center of photograph, with piles of dirt around it. Pathway paved
around curve, with wooden barrier in front of it.
- #10. Northwest corner/Esplanade in foreground, with fire hydrant,
"No Entry" sign and two young trees (no leaves). Man driving
bulldozer in background. Date on back is 3-25-74.
- #11. Northwest corner/Esplanade in foreground with fire hydrant
at far left. Young trees fully leafed-out.
- #12. Loading dock area/Lecture Hall in background and Seminar building
at right. Boards, temporary stairs against retaining wall. Nothing
is planted in the area above the retaining wall. The date on back
is 3-25-74.
- Completed Library Building 1972-1975
- Exteriors
- #01. Main Entrance/Close-up of "The Evergreen State College"
sign (the "G" in "College" is missing). Library
Building and students are in the background.
- #02. Front face/Clocktower at left. Four people standing together
in foreground. There are numbers written in the margins (245, 57/57).
- #03. View from Clocktower walkway looking southwest. Lecture Hall
at left. Two people walking towards main entrance of building.
- #04. Library face/View from in front of Clocktower, looking west.
Benches in foreground. Pedestrian and bicyclist in background at left.
- #05. Front face-east corner, first floor/View from stairs. Handrail
in foreground at right. Clocktower walkways in upper left. Man with
back to camera walking towards bicycle at center left.
- #06. Front face, first floor/View from stairs, looking towards main
entrance from east corner. Clocktower walkways across top of photograph.
Two people walking at left, two at right also, in the background.
- #07. Front face, walkways/View from main entrance walkway, looking
towards east corner. Clocktower at right. Tall trees in foreground,
one at left and one at right. Two people on second-floor walkway.
Two people on ground level.
- #08. Front face, walkways/View from main entrance walkway, looking
towards east corner. Clocktower at right. Two trees in foreground,
one at left and one at right. Four people are on second-floor walkway.
Three people are on ground level.
- #09. Loading dock side/Seminar I at right. Construction on Lab II
in background. Four cars parked along wall. "Handicap Parking"
sign is not yet mounted to wall.
- #10. Loading dock side/Seminar I at right. Construction on Lab II
in background. Three cars parked along wall. Delivery van at left.
Three "Handicap Parking" signs are mounted to wall.
- #11. Back face/View from west looking east. Path curves to the left.
Building in background at right.
- #12. Back face/View from east looking west. Path curves to the left.
Building at left. Young trees with wooden supports in foreground at
right.
- #13. Back face/Building in background, somewhat obscured by trees
at right. Meadow in foreground with a deer at right.
- Interiors
- Offices, Classrooms, Fourth Floor Cafeteria
- Library Murals
Box 5 of 16 Campus Buildings : Library Clock Tower Images 1970-
Box 6 of 16 Campus Buildings : Heating Plant and Utilities
- Site Preparation
- Unattributed Photographers
- #01. Architect's Rendering/Pen and ink.
- #02. Site Preparation/Pre-construction.
- #03. Construction/Large conduit pipes in foreground. First floor
construction in background.
- #04. Construction/Aerial view.
- #05. Nearing Completion/Southwest corner view. Road in foreground
curves to the right. "Lent's" truck at far left. Car parked
at far right.
- #06. Nearing Completion/Southeast corner. Close-up of man working
on building face from suspended platform.
- #07. Interior Construction/Close-up of man weldeng large conduit
(HVAC?). Great picture!
- #08. Interior Construction/Water on the floor. Temporary ramps leading
to upper level.
- Ron Allen Photography
- #01. Clearing/Central Plant S./69-120 Grading/7-2-70
- #02. Completed Building Prior to Final Paving/C.P. Area from S.W./8-24-71
- #03. Inside Pump Station/6-22-71
- Skyview Photos
- #01. Aerial View/Roof not completed. Cooling towers have not yet
been constructed./2-2-1971
- #02. Aerial View/Roof is nearly completed. Beginning construction
of cooling towers./4-4-1971
- #03. Aerial View/Roof is nearly completed. Cooling towers are nearly
completed./5-28-1971
- Cowley Photos
- Basement Construction
- #01. Basement Construction/Cement truck with striped drum left
of center.
- #02. Basement Construction/Looking West from East side/9-28-70
- #03. Basement Construction/Looking West from N.E. Corner/9-28-70
- #04. Basement Construction/Looking NE from SE Corner/9-28-70
- #05. Basement Construction/From East Side Looking West/10-16-70
- Main Floor Construction
- #06. Main Floor Construction/View from N.E. No walls constructed.
Man standing at center./11-27-70
- #07. Main Floor Construction/View from S.E. No walls constructed.
Man at center behind wooden railings./11-27-70
- #08. Main Floor Construction/View from S.E. Wooden wall form
at right. Four workmen holding ladder up to wall form at left./11-27-70
- #09. Main Floor Construction/View from North. Concrete barrel
in foreground at left. First wooden wall form in background at
right, with two cranes./11-27-70
- #10. Main Floor Construction/View from West. Basement truck
entrance in center of photograph. "Cooney Cranes" crane
at right./11-27-70
- #11. Main Floor Construction/View from N.E. Large pile of dirt
in front of building, in center. Ford dumptruck at left./1-29-71
- #12. Main Floor Construction/View from S.E. "P&H"
machine at right. Stack of 2"X4"s against building face,
also on roof./1-29-71
- #13. Main Floor Construction/View from South. PVC tubes in foreground
at left./1-29-71
- #14. Main Floor Construction/View from West. Crane in front
of basement truck entrance. Tubes and other building materials
in foreground at left./1-29-71
- #15. Main Floor Construction/View from North(?). Car in foreground
at left. Trees at right./3-25-71
- #16. Main Floor Construction/View from North(?). Large pile
of dirt in front of building at right./3-25-71
- #17. Main Floor Construction/View from South(?). Scaffolding
against building at right. Three construction workers standing
inside building at left./3-25-71
- #18. Main Floor Construction/View from East(?). Man in center
standing on ladder, working on wooden form. Man at left tying
his shoelace./3-25-71
- #19. Main Floor Construction/View from North. Pick-up truck
at left with hose trailer. At right, barrel and meter box./5-27-71
- #20. Main Floor Construction/View from S.E. "Lord"
pick-up truck in center, with hood open and man beside it. Another
truck to its left./5-27-71
- #21. Main Floor Construction/View from S.W. "Lent's"
Chevrolet pick-up truck at left./5-27-71
- #22. Main Floor Construction/View from East. Two men rigging
up suspended platform at left. "Lent's" flatbed truck
at right carrying tubes./5-27-71
- #23. Main Floor Construction/View from South East. Generator(?)
in center foreground, with power line pole behind it./7-28-71
- #24. Main Floor Construction/View from North East. Suspended
platform on left side of building. Bulldozer at right. Man to
left of center, facing building./7-28-71
- #25. Main Floor Construction/View from South. Forklift in front
of basement truck entrance, with a man standing to its right.
Dumptruck at far left. Front end of a car at right./7-28-71
- #26. Main Floor Construction/View from East. Large tree at left.
Cooling tower at right. Man in plaid shirt inside building./7-28-71
- Completed Building
- #27. Completed Building/Corner view. Brick box in center foreground.
Street lamp at right.
- #28. Completed Building/Main entrance side. Lights are on inside
the building. The ground is not yet paved.
- #29. Completed Building/Basement truck entrance side. Car at
far left.
- #30. Completed Building/Corner view. Steam coming from building
roof. Chain link fence at right, with car behind it.
- #31. Completed Building/Cooling towers.
- #32. Completed Building/Close-up of base of cooling tower. Sheet
of water pouring into bottom trough.
- #33. Completed Building/Inside the Central Utility Plant. Split-level
view.
Box 7 of 16 Campus Buildings : Lecture Hall
- Ron Allen Photography
- Pre-Construction
- #01. N.W. Plaza From E./69-234 Site Improvements/8-27-71
- Cowley Photos
- Construction
- #01. Construction/View from North. Cardboard box in center foreground.
Four workmen at left, two on scaffolding./2-1-71
- #02. Construction/View from West. Piles of tubes and rebar in
center foreground./2-1-71
- #03. Construction/View from South. Station wagon at left, in front
of "C E & C Inc." trailer. Workman at base of scaffolding,
center. Workman with circular saw at right./4-14-71
- #04. Construction/View from South. Car at left foreground, truck
front at right foreground. Car parked in front of "C E &
E Inc." trailer./7-6-71
- #05. Construction/View from East. Outside of building looks mostly
complete. Scaffolding visible inside building, at left./7-6-71
- Unattributed Photographers
- Pre-Construction
- #01. Architect's Rendering/Pen and Ink.
- Construction, Exterior
- #02. Construction-Exterior/Large pile of dirt in center foreground,
with bundles of rebar at right. Scaffolding across left side of
building.
- #03. Construction-Exterior/View from Library building. Red Square
is being graded-not yet paved. Many vehicles and trailers around
Lecture Hall. Lab buildings have not yet been started. Behind Lecture
Hall are trees.
- #04. Construction-Exterior/I-beams and other building materials
leaning against building at left beneath overhang. Scaffolding at
center and right beneath overhang.
- #05. Construction-Exterior/View from doorway(?). Library building
in background. I-beams exposed overhead, casting interesting shadows
on the ground. Hutch and bike rack at right.
- Construction, Interior
- #06. Construction-Interior/Man wearing striped shirt at right
holding clipboard, watching two workmen on far side of the room.
The lower level has a dirt floor.
- #07. Construction-Interior/View of tiered flooring and steps.
Man in striped shirt at far left.
- #08. Construction-Interior/View from inside, looking out. Man
in upper left, holding a long 2"X4". Clocktower visible
through doorway.
- Completed Building
- #09. Completion/Half-size photograph. On back, "SPECIAL AWARD
Excellence in the use of concrete".
- #10. Completion/View of door #1. Two students walking at right,
one at left. Library visible at far right.
- #11. Completion/The ground is wet. Several students walking towards
Lecture Hall, two students sitting on steps to Rotunda.
- #12. Completion/One woman and two men in foreground at left, walking
towards Library building. Sign on grass reads (in very small letters)
"Information Center Located Main Floor of Activities Building".
Crane visible over Lecture Hall roof.
- #13. Completion/Steps to door #1 at left. Tree branches in foreground
at left and right.
- #14. Completion/View from third or fourth floor of Library building.
Sprinklers are on at left. Lab I building in background.
- #15. Completion/View from elevated spot. Lecture Hall at right.
Lab II building and Seminar I behind it. Two students walking toward
door to Lecture Hall.
- #16. Completion/Two students sitting in grass in foreground at
right. Cluster of people at top of steps to Lecture Hall in front
of building entrance.
-
Box 8 of 16 Campus Buildings : Campus Activities Building (CAB)
- Construction
- Completed Structure
Box 9 of 16 Campus Buildings : College Recreation Center (CRC)
- Cowley Photos
- Construction
- #01. Construction/View from North. Large stump at right. "Olympia
Sand and Gravel" dump truck in center, with another machine./10-28-71
- #02. Construction/View from West. Corner view, with brick wall
at right. Trees at right./10-28-71
- #03. Construction/View from West. "Crown" portable toilet
at left. Clocktower is visible behind construction./10-28-71
- Unattributed Photographers
- Pre-Construction
- #01. Architect's Rendering/Pen and Ink
- Construction
- #02. Construction/View from third floor of College Activities
Building (CAB). Bridge to CRC in foreground. Workmen visible on
all three levels of the building./3-28-72
- #03. Construction/"No Parking on Black Top" sign at
center. Several cars parked behind it. Cement-mixer truck with striped
barrel in background at left./3-28-72
- #04. Construction/Corner view, brick face at right. Many stacks
and piles of wood and other building materials in foreground./3-28-72
- #05. Construction/From S.E. Corner view, brick face at right.
Door frame(?) on ground in foreground, at right./6-28-72
- #06. Construction/View from S.W. Two bundles of boards stacked
in center foreground. Pick-up truck carrying tubes in background
at left./6-28-72
- #07. Construction/View from N.E. Flatbed truck in foreground at
right. Pick-up truck in background at left. Plaza between CRC and
CAB is paved./6-28-72
- Completion
- #08. Completed Building/Corner view. Bridge to CAB in background
at left. There is snow on the ground.
- #09. Completed Building/View of bridge to CRC from third floor
of CAB. There is snow on the bridge.
- Interior
- #10. Interior/Swimming pools (no water).
-
Box 10 of 16 Campus Buildings : Student Residence Buildings (Dorms, Mods,
etc.)
- Construction
- Completed Structures
Box 11 of 16 Campus Buildings : Laboratory Buildings - LAB I and LAB II
- Construction
- Completed Structures
Box 12 of 16 Campus Buildings : Organic Farmhouse, Childcare Center and
Auxilliary Structures
- Construction
- Completed Structure
Box 13 of 16 Campus Buildings : Seminar Building
- Construction
- Completed Structures
Box 14 of 16 Campus Buildings : Communications Building
- Construction
- Completed Structure
Box 15 of 16 Campus Buildings : Longhouse
- Construction
- Completed Structure
Box 16 of 16 Campus Buildings : Seminar II
- Construction
- Completed Structure
Subseries : 4" X 6" Series
Box 1 of 2 Campus Buildings : Construction
- Surveying
- Administrative and Construction Staging area
- Library Under Construction
- Lab Building
Box 2 of 2 Campus Buildings : Completed
- Campus and Grounds
- College Activities Building (CAB)
- College Recreation Center (CRC)
- Central Heating Building
- Communications Building
- Dormitories and Modular Student Housing
- LAB I and LAB II
- Lecture Halls
- Library
- Seminar Building
Subseries : 3"X5" Series (Color)
Series: Campus Buildings Construction Planning Documents
Location : 1E4
- Seminar II Building Planning Documents 1999-2004