week |
M |
T |
W |
TH |
F |
1 |
Jan 8 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 All Program Mtg D1105 Sem II
Introductions and Program Set-Up Bench/Bridge Project Intro 3-5 (Governance) |
9 9-12 Design/Build Studio 3D Studio, Art Annex 109 A,B: Drawing Review (Ching: Chs. 1, 2, 3, 6, 7, 12) Ching: Chs: 5, 9, 11 Drawing Review Project Intro C: Shops/Review and Start-up
1:30-4:30 Design/Build Studio 3D Studio, Art Annex 109
A: Shops/Review and Start-up B,C: Structures (More) Reid:1-38
|
10 9-10 Peer Group Meetings 10-12 Seminar/Workshop Art Annex Critique Room/ Lab II 2207 Sinclair & Stohr: 1-31 Wikipedia Writing Project Intro
1-5 (Governance) |
11 9-12 Design/Build Studio 3D Studio, Art Annex 109 B: Shops/Review and Start-up A: Structures (More) Reid: 1-38 C: Drawing Review (Ching: Chs. 1, 2, 3, 6, 7, 12) Ching, Chs. 5, 9, 11 Drawing Review Project Intro
1:30-3:30 Design/Build Studio A,B,C: Work Time 3:30 All Program Mtg 3D Studio, Art Annex 109 Lecture/Workshop: History of the Wall Section |
12 (Open Studio) |
2 |
15
Martin Luther King Day (campus holiday) |
16 9-12 Design/Build Studio + SketchUp A: 9-10:20 SketchUp PC Lab, Library B: 10:30-12 SketchUp PC Lab, Library Bench/Bridge SketchUp Project Intro C: Shops/
1:30-4:30 Design/Build Studio A: Shops/ B,C: 1:30-2:50 Small Building Enclosure Reid, pp.39-63 B: 3-4:30 Sketch Up Open Lab Time
|
17 9-10 Peer Group Meetings 10-12 Seminar/Workshop Sinclair & Stohr, pp. 32-193
1-5 (Governance) |
18 9-12 Design/Build Studio + SketchUp B: Shops C: 9-10:20 SketchUp PC Lab, Library Bench/Bridge SketchUp Project Intro A: 9-10:20 Small Building Enclosure Reid, pp.39-63 A,C: 10:30-12 SketchUp Open Lab Time
1:30-3:30 Design/Build Studio A,B,C: Work Time 3:30 All Program Mtg Project Statement Workshop
Drawing Review Project Due |
19 (Open Studio)
|
3 |
22 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 All Program Meeting Large Buildings Reid: 63-77 Environmental Design Ideas: Scale Sections Design/Build Project Intro
3-5 (Governance) |
23 9-12 Design/Build Studio A, B, C: Shops
1:30-4:30 Design/Build Studio Bridge/Bench Project Review |
24 9-10 Peer Group Meetings 10-12 Seminar/Workshop Davis: 3-158
1-5 (Governance) |
25 9-12 Design/Build Studio A, B. C: Drawing/ Pattern Ching: Chs. 10, 11
1:30-3:30 Design/Build Studio A,B,C: Work Time
3:30 All Program Mtg Wikipedia Writing Project Check-in
Bench/Bridge SketchUp Project Due |
26 (Open Studio) |
4 |
29 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 All Program Meeting Conventional and Alternative Materials Meanings of Materials
3-5 (Governance) |
30 9-12 Design/Build Studio + SketchUp A: 9-10:20 SketchUp B: 10:30-12 SketchUp Patterns/Sections SketchUp Project Intro C: Shops/
1:30-4:30 Design/Build Studio A: Shops/ B,C: 1:30-2:50 Climate Services Reid, pp. 78-109 B: 3-4:30 Sketch Up Open Lab Time |
31 9-10 Peer Group Meetings 10-12 Seminar/Workshop Miller: Entire Book
1-5 (Governance) |
Feb 1 9-12 Design/Build Studio + SketchUp B: Shops C: 9-10:20 SketchUp Patterns/Sections SketchUp Project Intro A: 9-10:20 Climate Services Reid: 78-109 A,C: 10:30-12 SketchUp Open Lab Time
1:30-3:30 Design/Build Studio A,B,C:
3:30 All Program Mtg 3D Studio, Art Annex 109 |
2 (Open Studio)
|
5 |
5 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 All Program Meeting Field Trip Prep: Field Notes and Sketches
3-5 (Governance) |
6 9-12 Design/Build Studio A,B: Lighting Reid: 140-159 C: Shops/
1:30-4:30 Design/Build Studio A,B: Shops/ C: Lighting Reid:140-159 |
7 All Day: Field Trip to Seattle
1-5 (Governance) |
8 All Day: Field Trip to Seattle |
9 (Open Studio) |
6 |
Feb 12 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 All Program Mtg Seattle DebriefingReal World Project Options, Descriptions and Sign Up
3-5 (Governance) |
13 9-12 Design/Build Studio A,B,C: 9-10 Drawing/ Perspective Ching: Ch. 8 10-12 Shops
1:30-4:30 Design/Build Studio Sections Project Review |
14 9-10 Peer Group Meetings 10-12 Seminar/Workshop Video: Sketches by Frank Gehry Davis: 159-240 (reading for 2/21 seminar)
1-5 (Governance) |
15 9-12 Interim Self Evaluation Writing Workshop PC Lab, Library
1:30-3:30 Studio A,B,C: Work Time
3:30-4:30 All Program Meeting Program Progress Check-in Wikipedia Writing Project Draft Due Sections SketchUp Project Due |
16
(Open Studio)
|
7 |
19
Presidents Day (campus holiday) |
20 9-12 Design/Build Studio + SketchUp A: 9-10:20 SketchUp B: 10:30-12 SketchUp RW Project SketchUp Drawing(s) Intro C: Shops/
1:30-4:30 Design/Build Studio A: Shops/ B,C: 1:30-2:50 Fire Safety Reid: 178-193 B: 3-4:30 Sketch Up Open Lab Time
|
21 9-10 Peer Group Meetings 10-12 Seminar/Workshop Davis: pp 241-326
1-5 (Governance) |
22 9-12 Design/Build Studio + SketchUp B: Shops C: 9-10:20 SketchUp RW Project SketchUp Drawing(s) IntroA: 9-10:20 Fire Safety Reid: 178-193 A,C: 10:30-12 SketchUp Open Lab Time
1:30-3:30 Design/Build Studio A,B,C: Work Time
3:30 All Program Mtg Agenda TBA (Return Wikipedia Drafts) |
23 (Open Studio) |
8 |
26 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 All Program Meeting Video: TBA
3-5 (Governance) |
27 9-12 Design/Build Studio A,B: Drawing/ Presentation Graphics Ching: Chs. 11, 12 C: Shops/
1:30-4:30 Design/Build Studio A: Shops/ B,C: Acoustics Reid: 160-177 |
28 9-10 Peer Group Meetings 10-12 Lecture/Seminar: Questions of Scale, Questions of Beauty
Sinclair & Stohr: 194-275 (reading for 3/7 seminar)
1-5 (Governance) |
Mar 1 9-12 Design/Build Studio B: Shops/ A: Acoustics Reid: 160-177 C: Drawing/ Presentation Graphics Ching: Chs. 11, 12
1:30-3:30 Design/Build Studio A,B,C: Work Time
3:30 All Program Mtg Drawing/ Review |
2 (Open Studio)
|
9 |
5 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 All Program Meeting Workshop: Project Statements: Persuasive Writing Final Draft of Wikipedia Article Due
3-5 (Governance) |
6 9-12 Design/Build Studio + SketchUp A: 9-10:20 SketchUp?Project Support B: 10:30-12 SketchUp/Project Support C: Shops/
1:30-4:30 Design/Build Studio A: Shops/B,C: 1:30-2:50Materials/ B: 3-4:30 Sketch Up Open Lab Time
|
7 9-10 Peer Group Meetings 10-12 Seminar/Workshop Sinclair & Stohr: 276-329
1-5 (Governance) |
8 9-12 Design/Build Studio + SketchUp B: Shops C: 9-10:20 SketchUp/Project Support A: 9-10:20 Materials/ A,C: 10:30-12 SketchUp Open Lab Time
1:30-3:30 Design/Build Studio A,B,C: Work Time
3:30 All Program Mtg Agenda TBA |
9 (Open Studio)
|
10 |
12 9-10 Faculty/Staff Mtg 10-11 Program Business Mtg
1-3 No All Program Meeting Final Work Day!
3-5 (Governance) |
13 9-12 Design/Build Studio Location TBA Real World Projects Review RW Project SketchUp Drawing(s) Due
1:30-4:30 S Design/Build Studio Location TBA Review, Continued
|
14 9-12 Final Self Evaluation Writing Workshop PC Lab, Library |
15 9-10:30 Studio Clean-Up 10:30-11:30 Portfolio Set_up 11:30-1 Final Portfolio Review
1-3 Potluck and Wrap-Up Conversation |
16 9AM Final Self Evaluations Due to Seminar Faculty Mailboxes |
EV |
19 |
20 |
21 |
22 |
23 |