ARCHIVE - Ready Camera One: We're Live » Program Information http://blogs.evergreen.edu/rc1live “There is no program history in television—everything is experimental.” 1948 Sat, 04 Jun 2011 21:09:26 +0000 en hourly 1 http://wordpress.org/?v=3.2.1 ARCHIVE - CONFERENCES http://blogs.evergreen.edu/rc1live/blog/2011/06/04/conferences/ http://blogs.evergreen.edu/rc1live/blog/2011/06/04/conferences/#comments Sat, 04 Jun 2011 21:04:53 +0000 Sally Cloninger http://blogs.evergreen.edu/rc1live/?p=280 FINAL CONFERENCES:  READY CAMERA ONE WHERE: SALLY’S OFFICE COM. 305 TUESDAY, JUNE 7 10:00 Dana 10:20 Tara 10:40 Miranda 11:20 Myrtice 11:40 Alexa 1:00 MB 1:20 Amy 1:40 Burnett 2:40 Tavis 3:00 Michelle 3:20 Andrew WEDNESDAY, JUNE 8 10:00 Trevor 10:20 Pual 10:40 Tony 11:20 Charly 11:40 Kate 1:00 Lebene 1:20 Elise 1:40 Cait 2:40 Adam 3:00 David 3:20 Forrest Make sure you bring a hard copy of your self evaluation and a faculty/program evaluation to the conference. Please be prompt as these are very short conferences and we will need to keep on schedule! Thank you all for a great quarter ]]> http://blogs.evergreen.edu/rc1live/blog/2011/06/04/conferences/feed/ 0 ARCHIVE - TIME CAPSULE COUNTDOWN http://blogs.evergreen.edu/rc1live/blog/2011/05/22/time-capsule-countdown/ http://blogs.evergreen.edu/rc1live/blog/2011/05/22/time-capsule-countdown/#comments Sun, 22 May 2011 22:06:37 +0000 Sally Cloninger http://blogs.evergreen.edu/rc1live/?p=264 PRODUCTION SCHEDULE FOR TIME CAPSULE

WEEK 9

Monday, May 24 at noon
PRODUCTION MEETING (All) in Com. 308

Tuesday 9:30-4:30 (Green and Blue)
Thursday
9:30-4:30 (Red and Orange)
CAMERA BLOCKING REHEARSALS  in CCAM

Plus: Work, Work, Rewrite, Rehearse, Build, Design……..

WEEK 10

Tuesday, May 31: 9:30-10:00 Production Meeting

ALL day:  lighting consultation and installation

Load-in: Access Denied and Miss Represention

Wednesday, June 1 9:30  Access Denied

1:30 Finish set dressing, Miss Representation and

Pre-set The Mind Cleanser  (as much as possible)

Thursday, June 2  9:30 Miss Representation and 1:30 The Mind Cleanser

4:30 Both sets struck

Friday, June 3 9:30 Abduction

12:30 Strike

1:30 Playback and Critique (All)


]]>
http://blogs.evergreen.edu/rc1live/blog/2011/05/22/time-capsule-countdown/feed/ 0
ARCHIVE - Coming Attractions! http://blogs.evergreen.edu/rc1live/blog/2011/03/30/coming-attractions/ http://blogs.evergreen.edu/rc1live/blog/2011/03/30/coming-attractions/#comments Wed, 30 Mar 2011 14:53:28 +0000 Sally Cloninger http://blogs.evergreen.edu/template/?p=1 PRODUCTION SCHEDULE FOR TIME CAPSULE

WEEK 8

Monday, May 16:  12-3:00   Com. 326/308 (All)

Matrix meetings; brainstorm; writing. Pitch ideas to RC1.

Objective: Preparing a treatment or treatments for production meetings on Tuesday.

Tuesday, May 17: 9:30-11:00  Writing in your Teams
(Pre-production planning and writing continues all day with the exception of your production meeting with Sally in Com. 305).

11:00             Green

1:00              Blue

2:00             Red

3:00             Orange

Treatment(s) due

Objectives: Crew positions assigned, Working Title announced, Treatment reviewed, Production plan developed.

Wednesday-Thursday  Writing and Pre-production planning Continues; Production Designer  leads team as they prepare for meeting with Matt and Sally on Thursday (preliminary ideas for staging, set, props, costumes).

Thursday, May 19: 9:30 Com. 326

9:30 Final Pitches and Design Meeting                        (All)

1st Draft of Script due Thursday, May 19 for review

(Please review Chapter 6 “The Script and Production Plan” before you work on this part of the assignment!)



download Celtx here

Link to WordPress Workshop Information

]]>
http://blogs.evergreen.edu/rc1live/blog/2011/03/30/coming-attractions/feed/ 0