PRODUCTION SCHEDULE FOR TIME CAPSULE
WEEK 8
Monday, May 16: 12-3:00 Com. 326/308 (All)
Matrix meetings; brainstorm; writing. Pitch ideas to RC1.
Objective: Preparing a treatment or treatments for production meetings on Tuesday.
Tuesday, May 17: 9:30-11:00 Writing in your Teams
(Pre-production planning and writing continues all day with the exception of your production meeting with Sally in Com. 305).11:00 Green
1:00 Blue
2:00 Red
3:00 Orange
Treatment(s) due
Objectives: Crew positions assigned, Working Title announced, Treatment reviewed, Production plan developed.
Wednesday-Thursday Writing and Pre-production planning Continues; Production Designer leads team as they prepare for meeting with Matt and Sally on Thursday (preliminary ideas for staging, set, props, costumes).
Thursday, May 19: 9:30 Com. 326
9:30 Final Pitches and Design Meeting (All)
1st Draft of Script due Thursday, May 19 for review
(Please review Chapter 6 “The Script and Production Plan” before you work on this part of the assignment!)
download Celtx here
Link to WordPress Workshop Information
No Comments so far ↓
Like gas stations in rural Texas after 10 pm, comments are closed.